Project Location | Kotahena |
---|---|
Project Completion | Design Complete, Project on Hold |
Client | Keppel CT Developments (Pvt) Ltd |
Architect | DCA Architects (Pvt) Ltd |
Project Value | 7,000 Million LKR |
Scope of Works |
Structural Engineers Full Time Supervision of Work |
Description | This project is 49 story structures with 2 towers comprising 7 podium floors of parking. The two tower serve mainly as apartment spaces. The project was placed on hold following the completion of the foundations |
Project Location | Colombo 20 |
---|---|
Project Completion | Construction Stage |
Client | Baybrooke Towers (Pvt) Ltd |
Architect | P&T Consultants |
Project Value | 16,000 Million LKR |
Scope of Works | Client’s Structural Consultant under project manager. Structural peer review consultant Full time supervision of Work |
Description | TriZen Residential Development is a high rise project comprising 3 towers of approximately 52 stories. The first 11 stories comprise a common podium with parking and other common amenities. Towers built on bored cast in-situ pile foundation where the compromised with shear wall/RC column and RC Beam/Slab frame structure with a transfer floor at the 11th floor. The project began construction in February 2019 |
Project Location | Colombo 03 |
---|---|
Project Completion | Design Stage |
Client | D.R.Leisure (Pvt) Ltd |
Architect | D Plus Architects (Pvt) Ltd |
Project Value | Undisclosed |
Scope of Works | Client’s Structural Consultant. Preparation of Structural Scheme for Tender Full time supervision of Work |
Description | Damro Luxury Apartments is a high rise project comprising diaphragm wall and 4 basement levels and 30 upper levels including 2 transfer floors. The project began construction in year 2022 |
Project Location | Katugasthota |
---|---|
Project Completion | Construction Stage |
Client | Indra Hotels and Resorts Kandy (Pvt) Ltd |
Architect | Athula Amarasekara |
Project Value | Approx 4,000 Mn, 500 Million LKR |
Scope of Works | Client’s Structural Consultant. Preparation of Structural Scheme for Tender Full time supervision of Work |
Description |
Cinnamon RED Kandyis a hotel in Kandy comprising a basement level and 16 upper levels. The project began construction in February 2019. The building is founded on pile foundation. PT beams were introduced in parking floors to maximize the space utilization. A transfer floor was constructed at the level 06 and from there onwards reinforced concrete walls and flat slabs were proposed. |
Project Location | Colombo 03 |
---|---|
Project Completion | Construction Stage |
Client | Vallibel Finance (Pvt) Ltd |
Architect | Suchith Mohotti Associates (Pvt) Ltd |
Project Value | 1,155 Million LKR |
Scope of Works | Preparation of all Structural Design Drawings Periodic Inspection of Works |
Description | The Project comprised 15 story office building on a piled foundation with a semi basement level retained by reinforced concrete wall system. Basement earth is retained by a RC wall system. Structural/ civil work of the structure is completed and currently finishing work is in progress |
Project Location | Karapitiya, Galle |
---|---|
Project Completion | Construction Stage |
Client | Ministry of Higher Education – University of Ruhuna |
Architect | Arch-Triad Consultants (Pvt) Ltd |
Project Value | 700 Million LKR |
Scope of Works | Preparation of all Structural Design Drawings Periodic Inspection of Works |
Description | Twelve Storied Building is a storied clinical building on a piled raft foundation system with 2 basements. Basement earth is retained by RC retaining wall system with a RC beam/ slab frame and Shear wall/ RC column structure |
Project Location | Jaffna Town |
---|---|
Project Completion | Construction Stage |
Client | Ministry of Higher Education – University of Jaffna |
Architect | Arch-Triad Consultants (Pvt) Ltd |
Project Value | 700 Million LKR |
Scope of Works | Preparation of all Structural Design Drawings Periodic Inspection of Works |
Description | Reinforced concrete structure with Ground and 13 upper floors & a Basement. Structure is on a raft foundation and the basement is retained with a RC retaining wall structure |
Project Location | Bandaranaike International Airport, Katunayake |
---|---|
Project Completion | Design Completed |
Client | Japanese Airport Consultants for AASL |
Architect | Japanese Airport Consultants |
Project Value | 800 Million US$ |
Scope of Works | Preparation of all Structural Design Drawings
Full Time Inspection of Works |
Description | This project consisted of designing several structures such as the main Terminal Building, Pier Buildings, Terminal 1 Extension, Connecting Concourse, Chiller and cooling Tower Building, New Power Station, Link Bridges, Multi story car park and Utility tunnels. A variety of structural schemes adopted in order to meet architectural, functional and operational requirements of a modern international airport |